QUICK LINKS
CONTACT US
 
MUHIBBAH ENGINEERING (M) BHD
197201001137 (12737-K)
Lot 586 & 579, 2nd Mile, Jalan Batu Tiga Lama,
41300 Klang, Selangor Darul Ehsan, MALAYSIA.
Tel : (+603) 3342 4323
Fax : (+603) 3342 4327 / 3342 9816

 
 
 
StatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter StatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and CounterStatCounter - Free Web Tracker and Counter
MUHIBBAH NEWS

Jabatan Alam Sekitar (JAS) Malaysia sedang menilai Laporan Penilaian Kesan kepada Alam Sekeliling (EIA) bagi "Proposed 500 Acres Development of Phase 1 Kuantan Maritime Hub at Mukim Sungai Karang, Kuantan, Pahang Darul Makmur” oleh Muhibbah Engineering (M) Bhd.



The Department of Environment (DOE) Malaysia is reviewing the Environmental Impact Assessment (EIA) Report for "Proposed 500 Acres Development of Phase 1 Kuantan Maritime Hub at Mukim Sungai Karang, Kuantan, Pahang Darul Makmur” by Muhibbah Engineering (M) Bhd.


 New Project Awards
Bursa Malaysia : Mar 09, 2018
Muhibbah Engineering (M) Bhd has accepted the award from Prasarana Malaysia Berhad, for the Design, Supply, Delivery, Installation, Testing and Commissioning of Noise Barrier for Package NBE (E) for Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia.
 
Bursa Malaysia : Dec 27, 2017
Muhibbah Engineering (M) Bhd has received an award from Tenaga Nasional Berhad for the Construction of Reinforced Concrete Jetty and Platform for the Establishment of 230kV Senibong Switching Station and 230kV Overhead Line from PMU Senibong to Senibong Switching Station in Johor Bahru, Johor Darul Ta’zim, Malaysia.
 

Bursa Malaysia : Oct 10, 2017
 
Bursa Malaysia : Oct 6, 2017
 
 
 








Muhibbah Engineering (M) Bhd was appointed as the Engineering, Procurement, Construction and Commissioning (EPCC) Contractor to construct the RAPID Temporary Executive Village (RTEV) and RAPID Temporary Management Office (RTMO).
 
The RTEV and RTMO projects are located on Pengerang, Johor.
 
RTEV consists of 42 blocks of type A, 50 blocks of type B and 2 blocks of type D accommodation.
 
RTMO consists of 4 blocks of type A, 2 block type B and 1 block type C office.
 
 


LNG Regasification Facilities comprises of Island Jetty and Structures, with topside facilities including LNG Unloading System, LNG Regasification System, Boil off Gas Compression System, LP Booster Pump & Suction Drum Package, Gas Export, Metering, Pedestal Crane and Others Utilities System such as Hypochlorite Generator Package, Nitrogen Generation Package, Instrument Air Compressor & Dryer Packages, Emergency Diesel Generator Package, Open & Closed Drain System, HVAC System, Firewater System, Sea Water System, Control Room, Caissons etc.


The Samalaju Port Development Project involves the design, fabrication, procurement and commissioning of the Conveyor System Facilities.
 
Phase 1 of development projects includes one pipe conveyor approximately 2000m long dedicated to handling aluminia. It is also includes 3 conventional conveyors making up 3 import systems for a range of materials, 3 stockyards, 3 stackers and a control centre for the whole plant.
 









 The Yemen LNG Project, marine package, generally consists of the construction of a 350m jetty built 800 meters offshore. The jetty was designed to a depth of –40m ACD catering for LNG vessels of capacities ranging from 70,000 m3 to 205,000 m3. The jetty was also designed for a wave height of 7.8m with provisions for earthquake acceleration. Other associated works include a water intake / outfall structure, pumping station and outfall basin, electrical substation and navigation aids.